Unguarded edge, Level 4 slab
Tower B · Level 4
Voice note · 0:12
- Severity
- Owner
- Due
AI suggestion
Interactive demonstrations
Explore interactive demonstrations of real product workflows. Each one runs in your browser with sample data — no sign-up needed.
01 / 09Interactive demonstration
Follow one unsafe condition from the moment it is reported on site until the fix is verified and closed.
From observation to closure
Illustrative demonstration with sample data.
Step 1 of 6: Observe. A supervisor reports an unguarded edge on Level 4 with a photo, location and a short voice note — from a phone, in Arabic or English.
Tower B · Level 4
Voice note · 0:12
AI suggestion
02 / 09Interactive demonstration
A hot-work permit moves through its approval chain with the right checks at every stage.
Electronic permit to work
Illustrative demonstration with sample data.
Step 1 of 6: Request. The receiver raises a hot-work permit, completes the hazard checklist and attaches the job safety analysis.
Hot work
PTW-HW-0193
Precautions
Scan to verify on site
Signatures
03 / 09Interactive demonstration
A site photo becomes a structured, reviewable list of potential hazards and suggested actions.
AI photo safety review
Illustrative demonstration with sample data.
Step 1 of 5: Capture. A photo is taken on site or uploaded from a phone.
Potential hazards 0
Nothing is raised without human review
04 / 09Interactive demonstration
One view of safety performance across projects, contractors and sites — switch perspectives by role.
Executive command center
Illustrative demonstration with sample data.
Open observations
342
-8%vs. last month
Overdue actions
27
-12%vs. last month
Active permits
86
+5%vs. last month
Incidents this month
3
-25%vs. last month
Critical risks
5
0%vs. last month
Avg. days to close
4.2
-9%vs. last month
Observations vs. closures
ObservationsClosures| Chart data | Observations | Closures |
|---|---|---|
| Jan | 410 | 352 |
| Feb | 452 | 401 |
| Mar | 438 | 415 |
| Apr | 496 | 452 |
| May | 470 | 455 |
| Jun | 515 | 488 |
| Jul | 488 | 479 |
| Aug | 530 | 512 |
| Sep | 502 | 498 |
| Oct | 546 | 536 |
| Nov | 521 | 519 |
| Dec | 538 | 541 |
Contractor performance
Performance score
Priority alerts
05 / 09Interactive demonstration
Records flow between modules: an observation raises an action, an incident triggers an investigation, a change updates the risk register.
One connected HSE ecosystem
Illustrative demonstration with sample data.
Select a module to see its connections
Select a module to see its connections
06 / 09Interactive demonstration
Track energy, water, waste and fuel by site and period, and compare performance over time.
Sustainability analytics
Illustrative demonstration with sample data.
Total · This period
4,845MWh
| Chart data | This period | Previous period |
|---|---|---|
| Jan | 324 | 345 |
| Feb | 334 | 351 |
| Mar | 361 | 393 |
| Apr | 406 | 434 |
| May | 438 | 479 |
| Jun | 475 | 505 |
| Jul | 509 | 554 |
| Aug | 494 | 521 |
| Sep | 419 | 457 |
| Oct | 404 | 419 |
| Nov | 356 | 397 |
| Dec | 325 | 346 |
By site
4,845
MWh
07 / 09Interactive demonstration
Choose a source, pick columns, group and chart — then save, share or export.
Report designer
Illustrative demonstration with sample data.
Observations · Category
Live preview| Reference | Project | Category | Status | Severity | Due |
|---|---|---|---|---|---|
| OBS-2100 | Tower A | Housekeeping | Open | Low | 08 Nov |
| OBS-2107 | Utility building | Lifting | Open | High | 05 Nov |
| OBS-2114 | Tower A | Housekeeping | Closed | Medium | 11 Nov |
| OBS-2121 | Utility building | PPE | Open | Low | 10 Nov |
| OBS-2128 | Tower A | Housekeeping | Open | Low | 12 Nov |
| OBS-2135 | Tower A | Electrical | Open | Medium | 10 Nov |
| OBS-2142 | Infrastructure | Housekeeping | Closed | Low | 20 Nov |
| OBS-2149 | Infrastructure | PPE | Open | Medium | 25 Nov |
| OBS-2156 | Infrastructure | Electrical | In progress | High | 06 Nov |
| OBS-2163 | Tower B | Housekeeping | Open | Medium | 27 Nov |
| OBS-2170 | Tower A | Housekeeping | In progress | High | 26 Nov |
| OBS-2177 | Tower A | Housekeeping | Open | Low | 22 Nov |
| OBS-2184 | Infrastructure | Housekeeping | Closed | Low | 14 Nov |
| OBS-2191 | Tower A | Electrical | Open | Medium | 19 Nov |
| OBS-2198 | Infrastructure | Lifting | Open | Low | 24 Nov |
| OBS-2205 | Tower A | Work at height | Closed | Medium | 28 Nov |
| OBS-2212 | Tower A | Electrical | Closed | High | 04 Nov |
| OBS-2219 | Utility building | Lifting | Open | Low | 13 Nov |
| OBS-2226 | Utility building | Work at height | Closed | Low | 20 Nov |
| OBS-2233 | Tower B | Housekeeping | Open | Low | 21 Nov |
| OBS-2240 | Infrastructure | Lifting | Open | Low | 14 Nov |
| OBS-2247 | Utility building | Housekeeping | Closed | High | 20 Nov |
| OBS-2254 | Infrastructure | PPE | Closed | High | 03 Nov |
| OBS-2261 | Utility building | Lifting | Open | Low | 26 Nov |
Showing 24 of 24 rows
08 / 09Interactive demonstration
Select likelihood and severity to see how a hazard is rated, then apply controls to see the residual risk.
Interactive risk matrix
Illustrative demonstration with sample data.
Hazard: work at height on open slab
Inherent risk
16
4 × 4
HighResidual risk
8
2 × 4
MediumResidual risk: 8, Medium. High and critical risks are escalated for review and approval.
09 / 09Interactive demonstration
Complete a scaffolding inspection item by item — the score updates live and every failed item can raise an action.
Digital inspection
Illustrative demonstration with sample data.
Scaffolding inspection
Scaffold S-14 · Tower A
3 of 5 answered
Base plates and sole boards in place
Guardrails and toe boards fitted
Finding raised → corrective action
Access ladder secured
Inspection tag current
Platforms fully boarded
Score
67%
2 of 3 applicable items passed
Finding raised → corrective action1
Interactive demonstrations
Book a live demo and a product specialist will walk you through the modules that matter to your organization.