Ready permit template library
Seven ready permit types — hot work, confined space entry, excavation, work at height, electrical, lifting and cold work — each with its own form, precautions and approval workflow, installed as editable data.
Permit types as policy
Each type sets its duration, maximum validity, revalidation interval, expiry warning, required assessments (risk assessment, JSA, method statement, gas test, isolation), conflict policy and whether on-site activation is needed.
Permit form builder
Design versioned permit forms on a canvas with 33 field types, bilingual wording, conditional sections, role-owned sections and a live preview per role and language; forms that nobody could complete cannot be published.
Answer-driven approval routing
Answers such as a critical lift, live electrical work, a deep excavation or high residual risk switch on extra approval steps; the final approver is never the person who raised the permit.
Permit roles
Issuer, receiver, gas tester, fire watch and other permit roles are named on each permit, separate from system permissions.
Full permit lifecycle
Draft, submit, review, approve, activate, revalidate, extend within limits, suspend, resume, request closure, close, cancel and expire — each act recorded on the permit's timeline.
Gas testing against limits
Record gas tests against the limits set in the form; resuming or revalidating a permit is refused without a passing, recent gas test.
Isolation and lock-out management
List isolation points by energy type, apply and lock them, have them independently verified, and record their removal; work cannot start or close with isolations in the wrong state.
Precautions enforced by stage
Each type's precautions are copied onto the permit at three stages; open before-start precautions block activation and resumption, and open during-work or before-closure precautions block closure.